Contact us at the Eastern Engineering Group office or submit an inquiry online.
Portfolio
Hotel 18
- December 3, 2018
- Posted by: Jesus Gonzalez
- Category:
No CommentsHotel 18 Eastern Engineering Group provided the Structural Design, Calculations and Specifications for the redesign of the Hotel 18’s Structre. Client Buslam Company & Associates Corp Date 2017 Services Miami Beach, FloridaEighty Four Project
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
Eighty Four Project New 4-dwelling unit, five-story building with parking and common areas on the ground floor. Each dwelling unit shall have 3 bedrooms and 2.5 baths, as well as 1,450 SF of area under A/C. approximately. Common areas shall have 1,060 SF of area under A/C, for a total building area of 6,860 SF19 Gatehouse Rd.
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
19 Gatehouse Rd. Structural Design done by Eastern Engineering Group Client Ramos Martinez Architects, Inc. Date 2018 Services Sea Ranch Lakes, Fl901 Office
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
901 Office Structural Design done by Eastern Engineering Group Client Ramos Martinez Architects, Inc Date 2018 Services Miami, FloridaBarnstable Municipal Boardman Airport ATCT
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
Barnstable Municipal Boardman Airport ATCT Structural Design done by Eastern Engineering Group Client CTBXaviation Date 2010 Services Hyannis, MassachusettsCrespi Aparments
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
Crespi Aparments Crespi Apartments and Marina is a modern 4-story building having a main structure that consists of reinforced concrete columns supporting post-tensioned slabs. For a lateral force resisting system, the structure consists of reinforced concrete shear walls that enclose the main elevator shaft. The building's parking lot uses a high second floor central area,Diamond Building
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
Diamond Building Structural design and inspections of a four-story residential building. The structure consists of reinforced concrete columns and shearwalls, composite floor system made of steel channels, reinforced concrete slabs and permanent structural foam as formwork and shallow foundations Client Layer Zero Design Inc. Date 2014 Services North Miami Beach, FloridaGrove 27
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
Grove 27 Grove 27 is a mixed-use, residential building located in City of Miami, Florida. The building has a contemporary design,7 stories and comprises 32 residential apartment units. Client Caymart Design, Inc. Date 2018 Services Miami, FloridaPalm Center Parking Garage
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
Palm Center Parking Garage Structural analysis and design of a three-story 105,000 square foot parking garage, featuring 383 parking spaces. Client City of Hialeah Date 2010 Services Hialeah, FloridaPinecrest One
- November 19, 2018
- Posted by: Jesus Gonzalez
- Category:
Pinecrest One Structural Design done by Eastern Engineering Group Client Ramos Martinez Architects, Inc Date 2018 Services Miami, Florida